|
|
|
|
|
Opening Session |
Chair: Knox Msebenzi, PIESA |
|
|
|
FO-1 |
|
Opening Address
|
|
|
|
Felchesmi Mramba, Chair of PIESA, TANESCO, Tanzania |
Abstract
Presen.
|
|
|
|
FO-2 |
|
Keynote Address
|
|
|
|
Peter Moray, EUTC (European Utility Telecommunications Council) |
Abstract
Presen.
|
|
|
Session 1: Grid Connection of Renewable Energy |
Chair : Benson Muriithi, KPLC, Kenya |
|
|
|
F1-1 |
|
Technical Analysis of the Connection of Renewable Energy Generators to the Eskom Network
|
|
|
|
Clinton Carter-Brown & Mobolaji Bello, Eskom Holdings, South Africa |
Abstract
Presen.
|
|
|
|
F1-3 |
|
Grid Connection Technologies and Rural Electrification for the Optimum use of Renewable Energy
|
|
|
|
Toshiki Hanada, the Kansai Electric Power, Japan |
Abstract
Presen.
|
|
|
Session 2: Mini Grid Development
|
Chair: Peter Mtonda, ESCOM, Malawi |
|
|
|
F2-2 |
|
Micro Hydro Pumped Storage, Wind Power and Photovoltaic Combination for Rural or Remote Area |
|
|
|
Enggar Subono, PLN, Indonesia |
Abstract
Presen.
|
|
|
|
F2-3 |
|
Research on distributed generation optimization and the design of micro-grid architecture
|
|
|
|
Liang Ying, CEPRI, China |
Abstract
Presen.
|
|
|
|
F2-4 |
|
Large-Scale Mini-Grid Project in Kigoma, Tanzania (TBD)
|
|
|
|
Mayank Bhargava, NextGen Solar, LLC, U.S.A.(TBD) |
Abstract
Presen.
|
|
|
Session 3: Skills Development, International Standardization & Localization
|
Chair: Gerald Lehloenya, LEC, Lesotho |
|
|
|
F3-1 |
|
Technical Requirements for Communication
|
|
|
|
Peter Moray, EUTC |
Abstract
Presen.
|
|
|
|
F3-2 |
|
Distribution low Voltage Network Maintenance Guideline
|
|
|
|
Archie Jaykaran, Eskom, South Africa |
Abstract
Presen.
|
|
|
|
F3-3 |
|
DSP Based Technology and Calibration Limits the Uncertainty at Transformer Loss Measurements
|
|
|
|
Ben Kemink, Yokogawa Europe B.V., The Netherlands |
Abstract
Presen.
|
|
|
|
F3-4 |
|
Management of Electric Facilities and Lightning Protection
|
|
|
|
Tsuguhiro Takahashi, Central Research Institute of Electric Power Industry, Japan |
Abstract
Presen.
|
|
|
|
F3-5 |
|
Build the Grid from the Consumer to the Power Plant for a Faster More Effective, Greener and Less Costly Approach to Electrification
|
|
|
|
Greg Tosen, Eskom, South Africa
Mark Dudzinski, Light the World |
Abstract
Presen.
|
|